Click the thumbnail for a full size picture
DAZLE arrives at the VLT
Lifting the 40ft container from the lorry and unloading
Tripod and main structure installation on Nasmyth platform
Cold room lid installation, Dazle build comleted
The Dazlers, UT3 control desks, artificial starfield
The VLT enclosures, auxillary telescopes for VLTi, and the moon at sunset
Views from the star trail, inside the Residencia
David King
<king@ast.cam.ac.uk>
Last modified: 30 November 2006 15:30:00